top of page

Planning

02

01

Well concept

Experience in evaluation and selection of suitable well concept based on geological requirements, pressure, temperature, environment, water depth and other project specific drivers

02

Well design

Well design based on well concept selection, using the latest design tools for casing, T&D, hole stability, blow out and kill requirements and all aspects of well design

03

Drilling Program

Development of drilling program based on well concept and well design. Complete with time plan, AFE, risk screening and any other company specified topics

04

Drilling permits

Gather information and develop required drilling and environmental permits applicable for the area

05

Equipment selection

Advise in selection of equipment both for well construction, drilling and data aquisition

06

LLI identification & Risk register

Long Lead Items identification and alternatively sourcing equipment through our broad network world wide. Develop and populate risk register

07

HAZOP/HAZID & DWOP/TWOP/CWOP

Develop project HAZOP/HAZID meetings with online participation. Arrange DWOP/TWOP/CWOP sessions with online participation to identify risks, short comings and level of detail required

08

Well Test Planning

Experience in developing test programs, specifying required equipment, mobilization timelines, supplier selection and any permits required for well testing

09

Completion planning

Planning well completions according to field and project requirements, taking into account existing production facilities and infrastructure

bottom of page