Ship, Fulfill, Execute, Complete.

Successful execution requires strategic planning, operational efficiency, and continuous improvement.

Strategy

01

01

Concept selection

Experience in selecting well and rig concept based on location, existing infrastructure, regulations and other external factors governing the specific project

02

Rig market screening

Screening of market for suitable rigs based on concept selection, rig availability and any company preferences

03

RFI

Develop Request For Information from suitable rig supplier and service provider candidates, specifying minimum rig and project requirements

04

Rig evaluation

Rig evaluation to shortlist suitable candidates

05

Rig candidate selection

Selection of qualified candidates 

06

ITT

Invitation To Tender to shortlisted candidates based on company preferred contract format, rate structure, additional services required and so forth

07

Contract negotiations

Assisting in contract negotiations to ensure rate structure, agreed services, minimum technical specifications, incentives and improvement initiatives are agreed and captured

08

Contractor selection

Recommendation for award based on negotiation outcome and both technical and economic evaluation

09

Service and supplier provider selection

Following the same principles for evaluations, negotiations analysis

Planning

02

01

Well concept

Experience in evaluation and selection of suitable well concept based on geological requirements, pressure, temperature, environment, water depth and other project specific drivers

02

Well design

Well design based on well concept selection, using the latest design tools for casing, T&D, hole stability, blow out and kill requirements and all aspects of well design

03

Drilling Program

Development of drilling program based on well concept and well design. Complete with time plan, AFE, risk screening and any other company specified topic to be covered in the drilling program

04

Drilling permits

Gather information and develop required drilling and environmental permits applicable for the area.

05

Equipment selection

Advise in selection of equipment both for well construction, drilling and data aquisition

06

LLI identification & Risk register

Long Lead Items identification and alternative sourcing through broad network world wide. Develop and populate risk register. 

07

HAZOP/HAZID & DWOP/TWOP/CWOP

Develop project HAZOP/HAZID meetings with online participation. Arrange DWOP/TWOP/CWOP sessions with online participation to identify risks, short comings and level of detail required

08

Well Test Planning

Experience in developing test programs, specifying required equipment, mobilization timelines, supplier selection and any permits required for well testing.

09

Completion planning

Planning well completions according to field and project requirements, taking into account existing production facilities and infrastructure.

Execution

03

01

Detailed Operating Procedures (DOP)

Development of detailed procedures for execution of the well project at the rig site. DOP will typically be broken down into steps covering drilling, data acquisition, testing, completion and P&A of the well, depending on the well nature. (Exploration, production, injection, observation etc).

02

Lessons Learned register

Lessons learned register based on existing software applications, or as per company requirements.

03

Close out/ As Done

Update of DOP’s to as done based on actual execution and Lessons Learned for future reference

04

EOWR

Development of End Of Well Report after project completion

Advisory

04

01

Well control

Experienced well control advisors when required

02

Pressure management

Advisors when special pressure management is required for hole stability, avoiding reservoir damage or crossflow management, using CML or MPD

03

Yard follow up

Follow up of rig, equipment and facility construction through long experience with construction  of drilling vessels and production facilities.

04

Rig and Vessel intake

Specification and follow up of company specific requirements, class society requirements and authority requirements when contracting rigs vessels and facilities